I am almost certain that the "3m safety zone" referred to in the Verinage patent does not refer to how far away from the building people must stand to be safe during the induced collapse, but how far away the public must be kept from the equipment for safety (of both the public and the demolition personnel) during the preparation. (Isn't it completely obvious that standing 3m from a Verinage collapse or any collapse of even a one story building would be dangerous, and ridiculously dangerous if the building were a mere three stories?)
For an explosive demolition, even before the first charge is put into place, the public must be excluded from a distance over which a person could likely be injured by shrapnel from an unexpected detonation of explosives being stored or prepared at the scene. Whereas for a Verinage demolition, they must only be excluded from a distance over which a person could be injured by malfunctioning hydraulic compressors and actuators. Hence, 3m instead of 300m, for most of the typical many weeks of preparation. That's a big difference in expense and, at many sites, feasibility.
Once the actuators are in place and any of the hydraulics are made capable of holding pressure, the safety zone for a Verinage demo would be much larger -- but that would be needed only for a few hours or days of final preparation and the actual induced collapse.
I think anyone "skilled in the art" reading the patent would figure this out.
Respectfully,
Myriad
For an explosive demolition, even before the first charge is put into place, the public must be excluded from a distance over which a person could likely be injured by shrapnel from an unexpected detonation of explosives being stored or prepared at the scene. Whereas for a Verinage demolition, they must only be excluded from a distance over which a person could be injured by malfunctioning hydraulic compressors and actuators. Hence, 3m instead of 300m, for most of the typical many weeks of preparation. That's a big difference in expense and, at many sites, feasibility.
Once the actuators are in place and any of the hydraulics are made capable of holding pressure, the safety zone for a Verinage demo would be much larger -- but that would be needed only for a few hours or days of final preparation and the actual induced collapse.
I think anyone "skilled in the art" reading the patent would figure this out.
Respectfully,
Myriad