That's what i thought at first after reading that.
This is another very misleading statement.
Fire codes would never allow such a design.
On pg 3 of that same report is this:
The 5th floor base system generator room appears to have been constructed of 8 inch thick concrete block. The other generator room enclosures were constructed using gypsum board.
It's easy to miss because it's buried in a paragraph about sprinklers.
The intake fans were in the north end of the east wall.
The exhaust louvers were on the north wall.
There are other indications that my understanding of the 5th floor generator layout could be right. The FEMA report contains the following quote on page 5-29 regarding the possible consequences of fuel leak on floor 5:
My boldingDepending on ventilation sources for air, this is sufficient to flashover the space along the north wall on this floor.
............
The hot gases generated would be blocked from impacting Trusses 1 and 2 by the masonry wall separating the generation area from the mechanical equipment room, assuming that this wall was still intact after the collapse of the tower and there were no other significant penetration of walls.
The second paragraph on page 5-30 could also indicate a continues generator room on floor 5 along the north and the west wall.
On page 5-14 and 5-15 about the fuel pipe for the SSB generators:
The pipe traversed most of the length of the 5th floor immediately north of a concrete masonry wall running most of the length of the floor in an east-west direction
It looks as an established fact that all the generators on the 5th floor were contained behind a concrete masonry wall separating them from the rest of the floor. The SSB generator system was added in 1990 before the other modifications to the original base system. That masonry wall could very well be a original part of the building. If I remember correctly, WTC 7 was built to be easily modified according to the needs of future tenants. Therefore it would be plausible that additional generator space was originally allocated on floor 5, to accommodate future generators in addition to the two original base system generators on that floor. It is also likely that the SSB system used up all the available generator space allocated for future needs on floor 5. As a consequence of this the later generators added to the base system had to be located in areas not originally intended for generators elsewhere in the building, these rooms were constructed using gypsum boards as stated by NIST. Therefore I can not see anything misleading in the NIST statement you quoted Christopher7.
As I have said earlier there are a lot of unknowns here. We do not have all the information available to NIST. We are both making a lot assumptions based on limited information from an ongoing investigation. Based on the available information we can not rule out the possibility of a diesel fire on floor 5 playing a significant role in the initiating event.