please tell me this is just a typo, i dont want to believe you are this dumb
I was just commenting on the DREXS. I don't know if it's a typo I think they just got it wrong and included re-building costs with the clean-up cost. I can't find the site again but I did find this...
"Waste Industry, Others Help with Cleanup at World Trade Center Site
Implosion consultant Controlled Demolition Inc. (CDI), Phoenix, Md., has reported that it could take up to 14 months to remove all of the debris. New York City Mayor Rudolph Giuliani has estimated that cleanup could take up to one year. Total estimated cost for cleanup and rebuilding is $39 billion." -Waste Age (11/01/21) -
http://killtown.911review.org/wtc7/collapse.html
"A May 30 ceremony will mark the end of the cleanup and recovery work at the World Trade Center site, as the last heap of Sept. 11 debris is removed, Mayor Michael Bloomberg said on Thursday. The excavation will be completed three months ahead of what city officials had predicted, and will have cost about $750 million — about one-tenth of the initial estimate of $7 billion." -CBS (05/16/02)
More on DREXS...
"Controlled Demolition Incorporated’s implosion capabilities and DREXS (Directional Remote Explosive Severance) System facilitate the demolition or dismantling of all types of steel and concrete facilities to provide the safe, expeditious and cost-effective removal of industrial structures." -CDI
"Our DREXS (Directional Remote Explosives Severance) systems are engineered and applied to segment steel components into pieces matching the lifting capacity of the available equipment. State of the art, proprietary underwater blasting techniques guarantee fragmentation of concrete and masonry piers to removal limits, and maximize efficiency of debris removal." - CDI-UK
"CDI’s international affiliate, CDI UK, Ltd. acted as a subcontractor to CDI for implosion preparation supervision and explosives-handling operations." -CDI
"Using its DREXS (Directional Remote Explosive Severance) System, Controlled Demolition Incorporated segmented the spans into 300 ton sections which matched the lifting capabilities of Tidewater's equipment." -CDI