[Merged]Scott Forbes powerdown revisited

Before I address your points, you should know that your post has been reported. You can be argumentative and stand by a position without being immature.

Did you report it the first offense of it because now your friend is reported. You're full of it just like your version of 9/11.

First of all, pointing out that there was no power-down debunks the claim that there was a power-down. Even you should be able to process that simple equation.

What is relevant about the power-down itself? Is it only relevant when you want to pretend to debunk something? More garbage from the so-called debunkers.

Conspiracists use the power-down claim in an attempt to counter the logical point that no one could have placed explosives in the tower while it was occupied and security cameras were on.

Point me to some wtc security footage either way. Power-down or not. Woops. What's the point again?

No one is claiming that the time wasn't there to install wires in a building. What we're saying is that no one could have placed explosives or det cord in the tower.

Bull. Right here in this forum people talk about how it would have taken a year. Well... now it looks like they had YEARS.

That would involve getting the ordinance past bomb sniffing dogs, removing large wall sections off offices, placing HUGE shaped charges on columns (demolition experts have stated these charges that big would need to be carried in by fork lift), pre-weakening, replacing walls, leaving det cord running over the floors of the office... you get the picture.

Really? Did they need to do this while they were wiring the building like I sourced? Looks like you got debunked on your straw-man debunker. Congratulations.


Please keep it civil. Your post was offensive to a lot of people here.

Please report everyone if you're going to play hall monitor. If something is so offensive to you then report it from everyone. Unless of course you are dishonest. Woops called out again. How embarrassing.

For you.
 
What is relevant about the power-down itself? Is it only relevant when you want to pretend to debunk something? More garbage from the so-called debunkers.

The only relevance is that a good percentage of truthers present the "power-down" as evidence pointing to CD. If you aren't among them, kudos to you. But don't be so obtuse as to pretend they don't exist.

I must say, this is the weakest, most incompetent counter-argument I've seen on these threads. Congratulations - a new low.
 
What is relevant about the power-down itself? Is it only relevant when you want to pretend to debunk something? More garbage from the so-called debunkers.

I brought it up again because a truther on another forum claimed that the power-down is proof, or indication, of CD's being planted.

Now, if anyone knows how to properly file a FOIA with the PA, please post here or send me a PM.

Cheers,
P
 
...

Bull. Right here in this forum people talk about how it would have taken a year. Well... now it looks like they had YEARS.

...

To place optic fibre computer networks yes. Not explosives and det cord. You can't be that stupid, can you?
 
So none of you scary debunkers can think of any reasons they might need to turn off some power when installing fiber-optic cables?

http://seattletimes.nwsource.com/html/localnews/2003717300_webwaterparkdeath22m.html
Worker killed by high-voltage line at Wild Waves
By Jennifer Sullivan
Seattle Times staff reporter
On Monday, Kessler, 28, of Marysville, was killed at Wild Waves water park in Federal Way. And Kessler's co-worker, Steve Uplinger, 19, of Snohomish, was seriously burned after they struck a 7,200-volt power line.
Kessler and Uplinger had been working at the water park the past three weeks, retrofitting fiber-optic lines before the park's June 9 opening. They were in a cherry-picker-type lift when it struck a live Puget Sound Energy line. Kessler died almost immediately.


http://www.cdc.gov/NIOSH/face/stateface/ne/98ne025.html
Three Fiber Optic Cable Installers Killed by Contact with Power Line
A 41-year-old journeyman lineman, a 38-year-old journeyman lineman and a 24-year-old, all working as cable installers in aerial line construction, were killed when a guy wire contacted an 8,000 volt above ground power line. The 41-year-old and the 38-year-old were electrocuted and the 24-year-old died the following day as a result of electrical burns. There were no witnesses to the incident, but it appears a guy wire was disconnected by the victims and it contacted an 8,000 volt overhead power line that grounded to earth.


http://www.herzogcrebs.com/CM/Articles/Articles7.asp
John Logan, an apprentice lineman, was fatally electrocuted while working for Irby Construction Company. Irby was under contract with Sho-Me Power Electric Cooperative to install 63 miles of fiber-optic cable near existing power lines and to perform structure reinforcement on existing energized lines owned by Sho-Me Power. At the time of his death, Logan was working near one of the energized lines.


Besides that was fiber optic cable the only thing E-J Electric were upgrading?


http://september11.ceenews.com/ar/electric_towering_security_2/index.htm
CEE News, Jan 1, 2001
"The Trade Center was never designed for the amount of emergency power necessary for all those trading floors they have there," Calabro said. "Tenants would come in and need emergency power, and it was not available."
To solve that problem, E-J Electric set four generators on the roof of Tower 5, which was nine stories, as opposed to the 110-story Towers 1 and 2. E-J then ran high-voltage feeder cable to Towers 1, 2, 4 and 5, installed three substations and distributed power to the tenants. "We pulled 6,000 feet of high-voltage feeder cable from the roof of Tower 5, through the building, down through the concourse, through the parking garages and to the roof of Tower 1 and 2," Calabro said.

E-J Electric Installation Co., the country's oldest independent electrical contractor, won a $28 million contract in 1996 to tighten security at the World Trade Center. The Long Island City, N.Y.-based contractor installed 2 million feet of fiber-optic cable, hundreds of security cameras, access control and 110 turnstiles, including systems integration.
 
So none of you scary debunkers can think of any reasons they might need to turn off some power when installing fiber-optic cables?

http://seattletimes.nwsource.com/html/localnews/2003717300_webwaterparkdeath22m.html
Worker killed by high-voltage line at Wild Waves
By Jennifer Sullivan
Seattle Times staff reporter
On Monday, Kessler, 28, of Marysville, was killed at Wild Waves water park in Federal Way. And Kessler's co-worker, Steve Uplinger, 19, of Snohomish, was seriously burned after they struck a 7,200-volt power line.
Kessler and Uplinger had been working at the water park the past three weeks, retrofitting fiber-optic lines before the park's June 9 opening. They were in a CHERRY-PICKER-TYPE LIFT when it struck a live Puget Sound Energy line. Kessler died almost immediately.


http://www.cdc.gov/NIOSH/face/stateface/ne/98ne025.html
Three Fiber Optic Cable Installers Killed by Contact with Power Line
A 41-year-old journeyman lineman, a 38-year-old journeyman lineman and a 24-year-old, all working as cable installers in AERIAL line construction, were killed when a guy wire contacted an 8,000 volt above ground power line. The 41-year-old and the 38-year-old were electrocuted and the 24-year-old died the following day as a result of electrical burns. There were no witnesses to the incident, but it appears a guy wire was disconnected by the victims and it contacted an 8,000 volt overhead power line that grounded to earth.


http://www.herzogcrebs.com/CM/Articles/Articles7.asp
John Logan, an apprentice lineman, was fatally electrocuted while working for Irby Construction Company. Irby was under contract with Sho-Me Power Electric Cooperative to install 63 miles of fiber-optic cable near existing power lines and to perform STRUCTURE REINFORCEMENT ON EXISTING ENERGIZED LINES owned by Sho-Me Power. At the time of his death, Logan was working near one of the energized lines.


Besides that was fiber optic cable the only thing E-J Electric were upgrading?


http://september11.ceenews.com/ar/electric_towering_security_2/index.htm
CEE News, Jan 1, 2001
"The Trade Center was never designed for the amount of emergency power necessary for all those trading floors they have there," Calabro said. "Tenants would come in and need emergency power, and it was not available."
To solve that problem, E-J Electric set four generators on the roof of Tower 5, which was nine stories, as opposed to the 110-story Towers 1 and 2. E-J then ran high-voltage feeder cable to Towers 1, 2, 4 and 5, installed three substations and distributed power to the tenants. "We pulled 6,000 feet of high-voltage feeder cable from the roof of Tower 5, through the building, down through the concourse, through the parking garages and to the roof of Tower 1 and 2," Calabro said.

E-J Electric Installation Co., the country's oldest independent electrical contractor, won a $28 million contract in 1996 to tighten security at the World Trade Center. The Long Island City, N.Y.-based contractor installed 2 million feet of fiber-optic cable, hundreds of security cameras, access control and 110 turnstiles, including systems integration.

Last Child, you are truly a child with no experience in the way the world works.

Can't you see the difference between the examples that you cite of outdoor power line strikes and the indoor environment of the WTC?


Just admit it, you've never been inside of a building higher than three stories and you have no idea how building electrical systems work.
 
Last Child, you are truly a child with no experience in the way the world works.

Can't you see the difference between the examples that you cite of outdoor power line strikes and the indoor environment of the WTC?


Just admit it, you've never been inside of a building higher than three stories and you have no idea how building electrical systems work.

Here we go more pretend debunking. Now where would the installers have more room to stay away from power lines? Outside or inside a building?

And did this fiber optic upgrade not reach the outside world at some point?

And lastly...

WAS IT JUST A FIBER-OPTIC UPGRADE EJ ELECTRIC WAS CONTRACTED TO DO?

CAN YOU READ DEBUNKER?
 
http://www.thefoa.org/tech/safety.htm

Safety in Fiber Optic Installations

Electrical Safety
You might be wondering what electrical safety has to do with fiber optics. Well fiber cables are often installed around electrical cables. Electricians are well-trained in electrical safety, but some fiber optic installers are not. We've heard rumors of fiber installers being shocked when working around electrical cables, but know that two fiber installers were killed when working on aerial cables because we heard about it from OSHA.
These two installers were installing all-dielectric self-supporting aerial cables on poles. The hangers, however, were metal and over six feet long. Both had attached the hangers to the poles, then when installing the fiber cables had rotated the hangers enough to contact high-voltage lines.
So even if the fiber is not conductive, fiber hardware can conduct electricity or the installer can come in contact with live electrical wires when working in proximity to AC power.
 
Last edited:
Here we go more pretend debunking. Now where would the installers have more room to stay away from power lines? Outside or inside a building?

And did this fiber optic upgrade not reach the outside world at some point?

And lastly...

WAS IT JUST A FIBER-OPTIC UPGRADE EJ ELECTRIC WAS CONTRACTED TO DO?

CAN YOU READ DEBUNKER?

Inside of a building where the feeds are in a conduit that they would have no need to be near. Like he said, you have no clue how a building is wired.
 
Last edited:
Inside of a building where the feeds are in a conduit that they would have no need to be near. Like he said, you have no clue how a building is wired.

bull, bluff, pretend

besides...

WAS IT JUST A FIBER-OPTIC UPGRADE EJ ELECTRIC WAS CONTRACTED TO DO?

CAN YOU READ DEBUNKER?
 
bull, bluff, pretend

besides...

WAS IT JUST A FIBER-OPTIC UPGRADE EJ ELECTRIC WAS CONTRACTED TO DO?

CAN YOU READ DEBUNKER?


I read just fine. You on the other hand, not so much. What was I answering? (don't bother responding your worthless dribble is back to ignore)

Here we go more pretend debunking. Now where would the installers have more room to stay away from power lines? Outside or inside a building?
 
I read just fine. You on the other hand, not so much. What was I answering? (don't bother responding your worthless dribble is back to ignore)

Were the fiber-optics not going between buildings? Were they not connected outside the entire WTC complex? Were they even only contracted to do a fiber-optic upgrade?

Never mind keep your hands over your ears it's much easier to pretend that way. Because that’s all this 9/11 debunking is.

Pretend.
 
Last edited:
Were the fiber-optics not going between buildings? Were they not connected outside the entire WTC complex? Were they even only contracted to do a fiber-optic upgrade?

Never mind keep your hands over your ears it's much easier to pretend that way. Because that’s all this 9/11 debunking is.

Pretend.


The power conduits leading to the World Trade Center were buried. From a New York Times article about repairing the damage to utility systems near the World Trade Center:

New York is a vertical city, filled with lofty skyscrapers. This leaves little room for electrical and phone wires to run above ground. They must go below the surface . . .

When the trade center buildings were hit and later collapsed, heavy debris that was hidden by the smoke clouds went hurtling all over Lower Manhattan. Some of it pierced the ground, damaging utility systems. . . .

The city's two largest private utilities, Verizon and Con Edison, at first bypassed their underground systems and ran telephone and electric conduits -- the casings for wires -- along the sides of streets.


Further, from the National Fire Protection Association's report on the buildings' performance during the 1993 bombing (pp. 15-16):

Service conductors entering the complex are routed through a concrete encased duct bank which is located below an entrance/exit ramp for the B1 level. Still enclosed in concrete, the ceiling-level duct bank enters the service equipment vault, called the primary distribution center (PDC). . . .

The PDC-supplied electrical systems are designed so that electrical power to each building served is provided through more than one feeder. The substations for buildings in the complex are designed such that full electrical service will not be interrupted in any building even with the loss of two 13.8-volt electrical service conductors. . . . the feeders are encased in concrete over the distance to their respective substations throughout the complex.


Now who's pretending, LastChild?

17060474efd47d7e6b.jpg
 
So now the electric company was in on it too? Is there anyone who WASN'T in on this inside job that people like LC still have no evidence of other than speculation?
 

ISF - Join now!

Every member here is approved by hand. No bots, no spam, just people who care about evidence and honest debate.

Membership is free!

Create your free account

Back
Top Bottom