Perhaps the most useful and entertaining direction for this thread would be to predict what the next excuse will be when Blacklight/Brilliant Light Power fails to meet their most current promised deadline. That they successfully designed and manufactured the promised solar cells but that in doing so they discovered a modification that would allow them to triple their efficiency, causing the company to put off production until the redesigned cells could be incorporated? A modification in the geometry of the reactor that would allow it to fit within a thimble, with commercialization being delayed until this compact device can be sent off for large scale production? Or perhaps just a small glitch in a supply chain, or the concept that the hydrinos produced cause corrosion that forces a redesign, or even that the company has decided to focus on larger scale devices for the power grid after all, and forcing a delay in the actual distribution of these devices.
Ideas?
Ideas?
Last edited: