ozeco41
Philosopher
Actually I think you are asking the wrong question and possibly in the wrong place.So you don't think that the stiffener plates would extend the required walk off distance for the girder to fail for example?7, 8, 9, 10, 11 Makes a claim about omitted details. The details are technically of little if any consequence.
You quoted part of my comment and left out the key section which was this:
From my perspective that has been the key problem - BOTH SIDES working from bad assumptions about the technical context AND focusing on details. It has been a classic "lose the plot" situation - call it "forests v trees" OR "alligators and swamps" whichever metaphor you prefer:.... The issue has been extensively discussed here on JREF BUT with truther side using false context assumptions and most debunkers ignoring context and arguing details. Me and a couple of others calling "foul".
All the discussions have taken a micro focus on the details of the beams/girders and their end details WITHOUT giving due recognition to the overall technical context. For example much of the discussion focused on expansion or sideways movements of the walk-off girder whilst presuming the the supporting columns remained in their pristine condition locations to within fractions of an inch. So temperature expansions of beams/girders could be calculated to fractions of an inch presuming nothing else moved.
IMO that is crazy stuff in a building ravaged by fires.
My call - ignored by effectively all the combatants - was that the assumption was unwarranted and, absent proof that no movement of the columns was valid, the assumption MUST be that the columns had moved. THEREFORE all the fractions of an inch stuff was invalid. That is the status and I'm not particularly interested in going back into the morass. But my objective posting in this thread was to advise - explain - for egalicontrarian - in response to his request.
Noted. I also note that you are also focused in the details without defining the technical context.I disagree.
Yes - hardly the smartest bit of explanation by NIST. How anyone can claim that Col 79 "initiated" is beyond me. There is a whole thread dedicated to discussion of the place/part played by 79. It was without doubt a "key element in the collapse" but no way did it "initiate".The failure of the girder was quoted by NIST as being the initiating event of failure.
Details bereft of context PLUS I'm agnostic on NIST. I never rely on NIST reasoning.The erratum that they released changing the distance required from 5.5" to 6.25" never gave an explanation of where they got the extra 3/4" from. The maximum is 5.5", perhaps that's why.
As I said several times in the referenced post - it is a detail. I'm not satisfied that the details are in a proper context. So it is pointless me forming opinions about the details....before we agree on the context for said details.So you do not think that the inclusion of the stiffener plates would extend the ability of the girder to be pushed to the west without failing? Please explain that.
There is a lengthy thread or two on Girder Walkoff [Links needed????] and if you are interested in the Col 79 Initiation issue some useful comments among a lot of nonsense in the thread Total Building Collapse from a Single Column Failure
Last edited: