all the steel beams cut to a size ready to be haul away
This argument always makes me chuckle, because it illustrates perfectly incredulity based on ignorance.
-Steel structures tend to fail at the connection points.
-Steel is brought to the construction site in trucks.
-Individual pieces of steel are then assembled at the site to form building structure.
What size do these folks honestly think the steel in the rubble should have been, anyway? It doesn't take a genius to figure this stuff out.