Myriad has great difficulties with his structure entered in The Heiwa Challenge - see other thread. He has not yet identified what element fails first at initial contact and what the first contact really is! Is it an element in upper part C or in lower part A? And how much energy is required to do it? Or is it just a connection (another element) between elements?
Therefore Myriad cannot predict what happens next! What element is then failing?
Myriad is treating a complete floor as one element and allows it, C1, to contact the top floor, A97, of the lower part A. Neither C1 nor A97 is damaged! So what element is damaged first?
Vertical support columns? Where? Or connections? Where? Answer that to start with!
It would appear that it is a support element between C1 and C2 that fails first, while part A - the lower structure remains - unaffected. That's a good start. And then all other support elements between C1 and C2 fail and C2 may drop and contact C1. What happens then?
When floors C1-13 fall onto A97, they crush that floor and add it to the falling mass. Your total lack of understanding is staggering.