• Security incident: ISF was recently accessed by intruders. Please change your password, and change it anywhere else you used it. Read more

How Can they Stop the Oil Spill?

I find it hard deciphering politicians' real intent when they deliver their statements. CBS News put a slightly different spin on his story, all quoted from the CNN interview with Wolf.

"Unless we send the Navy down deep to blow up the well and cover the leak with piles and piles and piles of rock and debris, which may become necessary - you don't have to use a nuclear weapon by the way, I've seen all that stuff, just blow it up - unless we're going to do that, we are dependent on the technical expertise of these people from BP," Clinton said.

I posted the CBS link a few days ago.
 
Yes, I understand the hydrate (I think you all call it)
No. Hydrate production is a totally different process. What is being discussed is the natural gas that is dissolved in the oil
expands up to 100X's its below ground volume. That is why I repeatedly stress the importance/necessity of having a large pathway for the oil/gas to flow to. I then suggested that there be a manifold attached to the pipe below the surface to separate the gas from the oil before it reaches the surface. Alternatively you could construct a dome (much like used over a Tennis court in winter) over the area where the riser comes to the surface.
And you have been repeatedly told that this is not feasible. Instead, the oil mitigation is being performed with actual, existing equipment that has been developed over the years to specifically deal with oil and gas conveyance.
I accepted a long time ago that the three to four month relief well process is the only way to relieve the pressure at this site enough to seal this well casing off.
Then you have misunderstood the process. The intent is not to relieve the pressure, but to stop the flow at the reservoir by applying back pressure by means of the hydrostatic head of the kill mud.
My problem/emphasis has always been that we should be gathering as much oil as possible,
Neither you nor I are in a position to say that BP is not. The fact that the current containment is not as effective as all would like is also demonstrated by BP as it is a temporary solution and a more permanent one, with potentially better/total containment is being deployed.
as close as possible to where it is exiting the seabed.
It is being collected at the WELLHEAD.

You cannot get any closer to where the well is exiting the seabed, it IS the exit.
I see from their diagrams that they have three large dispersant tanks set up on the sea floor which are apparently feeding dispersant right into the stream of oil spewing into the Gulf. When wayward Hayward said not to worry the Gulf is a huge body of water it was not a gaff or a mis-statement, he was expressing what has been the dominant attitude that I have had so much problem with through this whole disaster.
While not dismissing the awful environmental impact that this spill is having, it can be argued that dispersant treated oil in the ocean is better that untreated crude.
Anyone who says that BP has been honest and forthright with the estimates is either clueless or hasn't been paying attention. First a thousand barrels a day, then five thousand/day then I think it was nine to twelve thousand/day, then twelve to nineteen thousand/day, then eighteen to twenty-five thousand/day and oh yeah, there would likely be a 20% or more increase when they cut the riser, then we are at twenty-five to forty thousand/day now we are at thirty-five to sixty thousand barrels per day. Can you not detect a pattern here?
Yes, as more information is gathered, so the estimates become more real.
From before day one of this spill BP knew what the pressures were of this well. They also had a very good idea of the fields volume and the flow which could be achieved through the drill string.
No they did not. If this was known there would have been no need to drill two exploration wells on the structure. The reasoning is in the naming of the wells.
They have been responding with wishful thinking when it comes to their estimates of flow and their chances of success for the top hat, top kill, etc. etc...If you ask me they should not even be allowed to drill a block of wood on dry land!
From their site I also see they have two vertical risers attached to piping/hose which is hooked into the BOP and is bleeding off some of the oil/gas to ships above.
This is a secondary purpose. This was originally installed for the top kill.[/quote] It just boggles my mind that BP did not admit from the start that they were in over their heads either that or they failed to somehow see that every gallon of oil they capture at the sea floor is a gallon that doesn't destroy habitat, beach front or kill living organisms.[/quote]Where did they ever say that this would be easy or that they didn't care if oil entered the GoM?
They call for ideas or perhaps they were forced to call for ideas, it doesn't matter. Then they say we have received to many to look at. Are they serious? Back to the block of wood on dry land! If they received to many to look at then share the ideas with the online community, they can sort them and simplify the review process remarkably for the engineers.
In my opinion this was a PR exercise aimed at the reality TV hungry USA. It worked to some degree by diverting attention away from the event, but I doubt it was ever going to be useful.

Consider some of the layman's suggestions on this thread.

It requires engineering expertise and in particular oil and gas engineering experience to solve this problem. Most people don't have the expertise required to grasp the enormity of the problem and the engineering, technology and manufacturing required to even think about approaching this problem.
I understand the volatility,
I don't believe you do. Tey are flaring 45 MILLION cubic feet of gas a day at current rate.
are you saying that problem can't be engineered safely? Then maybe it is time to stop all drilling til they can prove they know what they are doing.
No. Implementing your "solution" would introduce uncontrolled oil and gas at the surface of the GoM where vessels and people are work. Currently the flow to surface is controlled.
They have known since late April or early May that the relief wells were the only way to reduce the flow enough to seal this leak. They also knew it would be three to four months before they were completed. So yes they did have plenty of time to lay a pipe, or fabricate a properly sized riser.
No. Steel for this construction cannot be conjured up from thin air. The delivery time on the steel required alone would be months.

Instead, they are deploying existing, real-world, equipment specifically designed for the oilfield.
If engineered properly I would be glad to.
I wouldn't approach a leaking gas stove with a match, yet you'd approach 45 MILLION cu.ft of natural gas in a vessel that has multiple ignition sources on it.

Again, you are demonstrating that you do NOT appreciate the hazards of working in the oilfield.
Why in the heck they insist on burning the gas is beyond me.
Again, demonstrating that you do not fully appreciate the situation.
Why aren't they capturing it?
Because there is no containment vessel available and the priority is to mitigate oil spilling into the GoM.
 
EHocking: Nice of you to respond, but responses linked to reality appear to be a waste of time.
 
Lambda Ray: As an fyi, CBLs are indicative, not dispositive, as to cement integrity and like most measurements, subject to interpretation. They are actually more prone to mis-interpretation than were the pressure data, drilling mud returns, etc that BP and Transocean overlooked and/or ignored in the hours leading up to the blowout reaching surface and igniting.

AlBell, I don't entirely disagree; volumes in/out and pressures are important. But especially after a foam cement job in an HP well it is concidered best practice to evaluate the quality of the cement by logging it. I don't know how familiar you are with ultrasonic circumferencial tools, they are nothing like the old CBL's from last millennium, the log will among opther things tell you if you have channels in the cement, where the top of the cement is and whether there is any point in even trying remedial work. All this information should be at hand before you start inflow testing your casing/liner and suspend the well. Off topic, sorry.
 
Sorry to inadvertently lump you in with too many here who couldn't buy a clue on these subjects.

Perhaps we can agree that had it been our call we think we would have run a CBL. And then we hope would not have ignored the pressure data and mud returns, and used the CBL to locate best point for the first squeeze.
 
Mine seems to have been on target.
And I gave you credit for it...
Actually you were on track with this idea.

The technology update from BP on the LMRP option (31 May) has the Q4000 remaining hooked up to the choke and kill lines to take some of the flow (balance the flow) once they have the LMRP in place. It's at about the 8:30' mark.
Unfortunately, in the last technology update from BP - they are concerned about erosion in the C&K lines from the flow - they just weren't designed to do this job long term.
 
It requires engineering expertise and in particular oil and gas engineering experience to solve this problem. Most people don't have the expertise required to grasp the enormity of the problem and the engineering, technology and manufacturing required to even think about approaching this problem.

You got that right. Who else can come up with this stuff?
http://www.rr.com/news/topic/articl...rring_oil_from_broken_well_an_option_for_BP/1

1) Would the loss rate still be the same?
2) It seems they're having trouble with the flow pressure now, do they really expect to be able to pipe this stuff ten miles to unused wells?
3) What material would be displaced in the unused wells?

I keep picturing that episode with Homer Simpson where he's jacking around in the control room of the nuclear power plant in Springfield...
 
I Got It, Send Me My Millions

I have the answer to the greatest manmade environmental disaster in the history of the (insert proper demographic location here).

Let the Japanese fix it. Give "em two months. I guarantee they'll solve it, I'll even put up my millions in winnings.

Then, as a token of great fellowship, we'll let them harvest all the walruses that BP vowed to protect in the Gulf. For scientific purposes of course.
 
You got that right. Who else can come up with this stuff?
http://www.rr.com/news/topic/articl...rring_oil_from_broken_well_an_option_for_BP/1

1) Would the loss rate still be the same?
2) It seems they're having trouble with the flow pressure now, do they really expect to be able to pipe this stuff ten miles to unused wells?
3) What material would be displaced in the unused wells?

I keep picturing that episode with Homer Simpson where he's jacking around in the control room of the nuclear power plant in Springfield...
The idea that the oil and gas flowing out of the blowout could be diverted to other subsea wells nearby is absurd if they thought about what they were suggesting.

To divert the flow via pipelines to another well they need to get a pressure seal on the blown out well.

If they could get a pressure seal on the blown out they could kill the well (i.e. top kill) or at the very least set a BOP on it and "turn the tap off".
 
The idea that the oil and gas flowing out of the blowout could be diverted to other subsea wells nearby is absurd if they thought about what they were suggesting.

To divert the flow via pipelines to another well they need to get a pressure seal on the blown out well.

If they could get a pressure seal on the blown out they could kill the well (i.e. top kill) or at the very least set a BOP on it and "turn the tap off".
Would they actually need a pressure seal on the well if they instead suck out the oil using a subsea pump which then pumps it to the other wells. Just for one minute try not thinking in terms of always using the pressure to do pumping for you. It seems to me that if they equipped the diversion lines with pumps to the other wells then they could actually relieve a little of the pressure or at least lessen the flow of the leak.

Don't make me pull out the fluids engineer I just met the other day.

I still intend to answer all your other comments just don't have time now. I know you don't care, but it is a matter of principle with me.
 
I can find no reference in his CV that he studied engineering...:rolleyes:


Ha ha! I bet you never even looked. :rolleyes:

Clinton's engineering studies are irrelevant. The only thing that is relevant is that it is Clinton that is saying this "crazy" thing.
 
Would they actually need a pressure seal on the well if they instead suck out the oil using a subsea pump
There's the rub. The problem with a blowout is not storage of ejeculate, but how to contain or capture it. A subse pump to get the oil and gas out of this well is not the problem at all. Quite the opposite.

The engineering problem that BP is faced with is not so much diverting the well flow somewhere but actually capturing in the first place. In order to reinject the oil and gas into another receptacle (be it another well or merely a surface tanker) the problem is capturing the well flow.
..which then pumps it to the other wells.
As I said previously, in order to pump the flow into something else, you need to have containment of the flow. They don't have it. If you can get the flow to a pump, you need to get it to a containment vessel (and I don't mean a boat when I say vessel, a pressure vessel, i.e. a tank). To inject into another storage area (tank, tanker, well), yes, you would need to contain the flow in some manner in order to employ any sort of pump to then redeploy (pump) it anywhere.
Just for one minute try not thinking in terms of always using the pressure to do pumping for you.
You have no choice but to consider the pressures involved.
The whole problem with containing the blowout is that nothing that has been put on top of the wellhead so has been capable of countering the well flow pressue. There is no "pumping" to be considered.
This is an uncontrolled well flow
It seems to me that if they equipped the diversion lines with pumps to the other wells then they could actually relieve a little of the pressure
Not the issue. It is not that the "diversion lines" are incapable of flowing the oil and gas, it is that the containment at the wellhead is incapable of capturing the current flow.

If BP were able to seal the wellhead to the current "diversion lines" all would be rosy - all the oil and gas from the blowout would be diverted to surface equipment that could contain the oil and flare the gas until BP intercept the blown out well and kill it.
or at least lessen the flow of the leak.
If they can not contain the flow at the wellhead, they can not "lessen" the flow.
Don't make me pull out the fluids engineer I just met the other day.
Feel free.
I still intend to answer all your other comments just don't have time now. I know you don't care,
I think that the history of my posting on this thread to date is answer enough for such a cheap ad hom attack.
but it is a matter of principle with me.
Oh, of course. No one else on this thread has any personal principles except yourself....:rolleyes:
 
Ha ha! I bet you never even looked. :rolleyes:
I'm an engineer. We're anal. Yes, I looked.;)
My statement of "I can find no reference in his CV that he studied engineering...:rolleyes:" is both correct and accurate.
If you would you care to refute my statement please do...
Clinton's engineering studies are irrelevant.
I disagree.
His opinion is not only ill informed, but also an irrelevant appeal to authority.
I'm constantly pissed off with uninformed opinion on how to stop this thing. I have little respect for authority that is not earned.
The only thing that is relevant is that it is Clinton that is saying this "crazy" thing.
So you agree.

Clinton's statement is ******** and should be ignored for the ******** it was.
 
I have the answer to the greatest manmade environmental disaster in the history of the (insert proper demographic location here).

Let the Japanese fix it. Give "em two months. I guarantee they'll solve it, I'll even put up my millions in winnings.

Then, as a token of great fellowship, we'll let them harvest all the walruses that BP vowed to protect in the Gulf. For scientific purposes of course.

Will it involve a giant moth and two tiny elfs in a box?
 
Just thought I'd respond with the latest news on the capping this well to AlBell because he asked me in a PM about images of two pipes inside the cut riser and the speculation on whether this was drillpipe or casing.

It would appear from the Technical Updates on the sealing cap, that the tubing seen in that image was in fact two sections of drillpipe. My guess is that it was the original cementing string sitting in the well bore and then, when the riser bent and broke, it broke the drillstring above the BOP stack and then dropped into the wellhead/BOP assy. That's my very superficial assessment of it. Hopefully AlBell will find this informative even if no one else does.

As to my previous questioning on why BP hadn't stabbed a second BOP stack onto the well? This is just what the sealing cap has been designed to do.

They are unbolting the cut riser flange from the existing BOP that the LMRP has been sitting on and installing a "transition" flange. This flange essentially works as a connection type crossover, from the bolted flange on the top of the BOP stack to different connector type that will connect the new 3 valve capping stack.

Note, that while the capping stack can shut in the well it is not the prime purpose of this capping stack. It was designed to connect to the larger tanker/processor vessel, the Helix Producer. On initial install BP will conduct a shut in pressure test by closing off the well with this stack and it will definitely aid kill procedures when the relief well(s) intersect the blowout by removing an exit for the kill mud and well fluids.

From BP's audio update 07:30 11 July.
At 3am 11 July the existing flange had been removed and they were determining whether the two drillpipe stubs sticking up out of the top of the BOP stack needed to be strapped together before running the transition flange.

I see from an AP news item and BP's video feeds that the transition flange has been installed (i.e. about - 07:30hrs, 12 July) and the running (drill)string has been disengaged and pulled to surface. The current video shows ROVs tightening the flange bolts.
 
Thanks, EH.

We'll hope relief well one and the pressure containment possibilities inherent in this new cap can shut Macondo in.
 

ISF - Join now!

Every member here is approved by hand. No bots, no spam, just people who care about evidence and honest debate.

Membership is free!

Create your free account

Back
Top Bottom