JayUtah
Penultimate Amazing
This has been an issue for a week here in Utah. The Box Elder county commission voted yesterday unanimously to approve a 9-gigawatt, 62 square-mile (160 square-kilometer), hyperscale AI data center near the north shore of the Great Salt Lake. There are too many irregularities with this project to even summarize. As has become commonplace in Utah business and politics, the deal was all worked out in back rooms and foisted on the public. No public comment was allowed. The project is authorized under military authority, so it bypasses almost all environmental assessments on "national security" grounds. Yet it's being built by and for billionaire Kevin O'Leary.
9 gigawatts (that's about 7 Marty McFly time-jumps) is twice as much power as the entire state of Utah presently uses. The project includes a gas-fired powerplant to generate all the power for the data center. Utah has a serious pollution problem owing in part to our unique microgeography and microclimate and in part to large-scale mining operations southwest of the lake. Since the environmental assessment for this project is just a lot of handwaving, we aren't able to assess the pollutant load from the plant.
62 square miles is bigger than many entire Utah cities. The proposed campus will be roughly the size of St. George, Utah. Now Utah is home to a lot of empty space. But the proposed site is actually near inhabited areas whose inhabitants have had zero say over whether they want this in their backyards.
Utah is a water-poor state. Its signature lake is projected to dry up entirely in less than a decade because of commercial draws from its watershed. Our governor routinely issues drought emergency orders curtailing the use of water. Yet the same governor is who pushed this project through back channels and sprang it on the county officials with little warning. The O'Leary group assures people that it will used closed-loop water cooling, but closed-loop is not net-zero consumption. Nor does the statement include the power plant and its cooling requirements. When people pressed about the proposed water usage, we got no hard numbers and a whole lot of, "Trust us, bro."
The lack of transparency in this massive project has been egregious. Naturally people are upset at this having been foisted on them basically over only a two-week period. And then when they protest (because that's all they have left), they're dismissed as unruly.
www.ksl.com
9 gigawatts (that's about 7 Marty McFly time-jumps) is twice as much power as the entire state of Utah presently uses. The project includes a gas-fired powerplant to generate all the power for the data center. Utah has a serious pollution problem owing in part to our unique microgeography and microclimate and in part to large-scale mining operations southwest of the lake. Since the environmental assessment for this project is just a lot of handwaving, we aren't able to assess the pollutant load from the plant.
62 square miles is bigger than many entire Utah cities. The proposed campus will be roughly the size of St. George, Utah. Now Utah is home to a lot of empty space. But the proposed site is actually near inhabited areas whose inhabitants have had zero say over whether they want this in their backyards.
Utah is a water-poor state. Its signature lake is projected to dry up entirely in less than a decade because of commercial draws from its watershed. Our governor routinely issues drought emergency orders curtailing the use of water. Yet the same governor is who pushed this project through back channels and sprang it on the county officials with little warning. The O'Leary group assures people that it will used closed-loop water cooling, but closed-loop is not net-zero consumption. Nor does the statement include the power plant and its cooling requirements. When people pressed about the proposed water usage, we got no hard numbers and a whole lot of, "Trust us, bro."
The lack of transparency in this massive project has been egregious. Naturally people are upset at this having been foisted on them basically over only a two-week period. And then when they protest (because that's all they have left), they're dismissed as unruly.
Box Elder County commissioners OK controversial data center proposal
Box Elder County commissioners approved a controversial data center proposal at a special meeting that drew hundreds of opponents of the proposal.
www.ksl.com