It certainly reduces the number of trucks required at the site if concrete is poured elsewhere.
The specific prefab floor design may not have been used elsewhere but I certainly recall seeing prefab concrete floor sections yravelling through town on flatbeds many timrs in the past few decades.
I believe they assembled sections of the joists / decking at grade and lifted them in place. Keeping more workers on the ground instead of 50 stories up is just good common sense. it is not feasible in most high rise construction simply because of the scale of the typical project.